24-hour TSP Monitoring Results
Station CM_AB1a, The Hong Kong Ice and Cold Storage (Aberdeen)                    
Start Finish Weather Filter Weight (g) Elapsed Time Reading Sampling Time Flow Rate (m3/min) TSP Conc. Action Level Limit Level Observations / Remarks Sampler Filter
Date Time Date Time   Initial Final Initial Final (hrs) Initial Final Average  (µg/m3)  (µg/m3)  (µg/m3)   ID ID
05-Apr-12 Site closed 0 0
11-Apr-12 08:09 12-Apr-12 08:09 Sunny 2.7827 2.8655 3931.72 3955.72 24.00 1.0996 1.0996 1.0996 52 174.2 260 Drilling Ice Factory 994
18-Apr-12 08:09 19-Apr-12 08:09 Fine 2.7828 2.9242 3955.75 3979.75 24.00 1.1632 1.1632 1.1632 84 174.2 260 Drilling Ice Factory 1001
23-Apr-12 08:09 24-Apr-12 08:09 Fine 2.7773 2.8343 3980.78 4004.78 24.00 1.1576 1.1576 1.1576 34 174.2 260 Operation of excavator and loading Ice Factory 1013
27-Apr-12 08:09 28-Apr-12 08:09 Fine HVS failure    
                        Min. 34          
          `             Max. 84          